Installation and Commissioning
The installation and commissioning of UNIROB packaging machines requires a high level of experience and special know-how.
Our service technicians who have already been involved in the construction of the packaging machine offer the best prerequisites to install and commission the machine at the production site in a proper and timely manner.
Before a packaging machine leaves our plant, it must pass the FAT (Factory Acceptance Test). During this factory acceptance, the packing machine is usually examined in the presence of the customer with regard to the specifications to be fulfilled and the prescribed performance and efficiency. The test results obtained are documented in test protocols and handed over to the customer.

Only if the FAT is successfully completed and the packing machine is in a perfect condition, it will be sent to its journey to our customers. After a completed installation, the system is commisioned and put into operation with another test, the so-called SAT (Site Acceptance Test).
Experienced practitioners from the fields of mechanics, electrical engineering and electronics ensure that the operator is trained immediately after the commissioning and that the customer can start production.